boand3
boand3 boand3
  • 04-05-2018
  • Mathematics
contestada

A construction company needs to remove 2 1/6 tons of dirt from a construction site. They can remove 7/8 tons of dirt each hour. What is the total number of hours it will take to remove the dirt?

Respuesta :

jupjupjupjup202 jupjupjupjup202
  • 04-05-2018
The answer is 4.

Hope I helped :)
Answer Link

Otras preguntas

Which words make up the prepositional phrase in this sentence? Our family often picks fresh, ripe strawberries around Memorial Day. a. fresh, ripe strawberries
3(2j-k) = 108, for j
when solving a real-world problem to find a persons age , would a negative solution make sense ?
What is 4 ten thousands 4 thousands times 10
Maggie has a ribbon 27 feet long. What is the length of the ribbon in yards? Equation : answer :
shelley spent 17 minutes washing the dishes. she spent 38 minute cleaning her room. Explain how can use mental math to find how long shelley spent on the two ta
.304 in expanded notation
What is 1.65 divided by 100?
a square patio has an area of 200 square feet. how long is each side of the patio to the nearest 0.05?
How many grams of calcium phosphate can be produced when 78.5 grams of calcium hydroxide reacts with excess phosphoric acid? Unbalanced equation: H3PO4 + Ca(OH)