bayneshoffman4439 bayneshoffman4439
  • 04-04-2018
  • Business
contestada

The initial assessment of feasibility is made in theâ ________ phase of the systems development life cycle.

a. requirements analysis

b. component design

c. system maintenance

d. implementation

e. system definition

Respuesta :

fireflies854 fireflies854
  • 04-04-2018
a or d hope this helps
Answer Link

Otras preguntas

How many atoms of hydrogen are there in 36 g of NH4?
How does creators portray a same subject in two medium?
How are inherited characteristics passed on through generations?
quick! i need help with this iready lesson
In the poem, I wandered lonely as a cloud, what does “company” refer to in this case? (“In such a jocund company”) “Company” most likely means: A. A corporation
The perimeter of a rectangle is 24 cm. If the length is 7 cm, find it width​
A canoeist traveling with the current traveled the 24 miles between two riverside campsites in 2 hours. The return trip against the current took 3 hours. Find t
Briefly summarize Texas History, covering all the major events from the first mapping of the coast of Texas to the present - WILL MARK BRAINLIEST
what are the values of angles G and H?
What is Technology?? Answer and get freee points​