duncanreleford
duncanreleford duncanreleford
  • 12-03-2018
  • Physics
contestada

determine the quantity of work done when a crane lifts a 100-n and block from 2 m above the ground to a 6 m above the ground

determine the quantity of work done when a crane lifts a 100n and block from 2 m above the ground to a 6 m above the ground class=

Respuesta :

lidaralbany lidaralbany
  • 07-02-2019

Answer: 400 J

Explanation :

Given that,

Force = 100 N

Distance  = 6 m - 2 m = 4 m

Now , the work done is equal to the multiplication of the force and distance.

W = F * d

[tex]W = 100\ N\times 4\ m[/tex]

[tex]W = 400 J[/tex]

Hence, the quantity of work done is 400 J

Answer Link

Otras preguntas

The focal points of an ellipse are (12, 0) and (−12, 0), and the point (12, 7) is on the ellipse. Find the points where this curve intersects the coordinate axe
How does Kennedy develop the central idea of the speech? Kennedy develops the central idea that the press has been negligent in its duties by highlighting impor
Find the center and the radius of the circle with the equation: x^2-4x+y^2
During Eisenhower's presidency, what is happening in Asia and Africa?​
solve the equations using substitution 7x-2y=3 14x+y=14
Why is Lady Macduff angry with her husband?
There are 30 mystery books in Chin's book collection. If 6% of his books are mysteries, how many books does Chin have in his collection?
How long will an external compression headache last after i remove the source of pressure?
What is the Approximate volume of the sphere below?
17=x+4 what’s the answer