Beverly7520 Beverly7520
  • 01-03-2018
  • Social Studies
contestada

In the lean principles philosophy, unexpected downtime is the result of unreliable processes.

a. True

b. False

Respuesta :

Grace0424
Grace0424 Grace0424
  • 01-03-2018
I thinks the answer is true
Answer Link

Otras preguntas

Why did the envelope lose the race with the cardboard box? ( math worksheet all problems answer)
A uniform rod is pivoted at its center. It is acted on by two forces in the plane. Each force has the same size, equal to 10N (newtons). In which case is there
what is 2.8294 to the 9th power
Help fast please!A total of 20.0 mL of sodium hydroxide (NaOH) was neutralized by 30.0 mL of 0.250 M hydrogen bromide (HBr). What was the concentration of the s
Read the excerpt below and answer the question.
help pppppppppllllllllllllllllsssssssssss
The number in the corner is 29 degrees, please help me !?!?
a swimming pool has a perimeter of 72 ft The short sides measure 16 ft What is the length of the longer sides of the pool
x(2x-5)=3 with work pleasspe​
Imagine you are a caveman out innocently picking berries when suddenly you come nose to nose with a sabre-tooth tiger. (A) While you were simply gathering, the