The best time to establish reasonable controls is when they are first needed during the project.

Respuesta :

meerkat18
meerkat18 meerkat18
  • 28-10-2017

The best to establish reasonable control in the project is at the start of the project but not when they are first needed during the project.

As we can keep a control or keep some standards at initial stages but now when required. This would then provide best results rather than keeping controls when needed in the project to keep the time saved mostly.

Hence the statement is false.

Answer Link

Otras preguntas

The three rocks statements below are observations of the same rock sample: - the rock has intergrown crystals from 2 to 3 millimeters in diameter - the mineral
convection causes huge slabs of rock to rise and sink slowly through earths mantle. the main heat source for this movement is what?
Coach Wilson ordered T-shirts for the basketball team from two different T-shirt suppliers. One supplier charged $16 for each shirt, as well as 5% for shipping.
What is the cause and effect of russia signing the treaty of brest-litovsk?
4(x-2)-3=9 I have to solve for X but I'm confused
What is the function of the midpiece of the sperm?
Need help with 5 and 6 there is a picture below :)
for each question trent gets correct on each quiz, he earns 5 points. he can also earn an extra 15 bonus points on the quiz. which expression shows the total po
steroids, cholesterol, and wax are all examples of?
what was an effect of Magna Carta In England ?