camryn903 camryn903
  • 13-10-2017
  • Computers and Technology
contestada

"​the three legs of a project triangle are _____, scope, and time."

Respuesta :

Kalahira
Kalahira Kalahira
  • 23-10-2017
The project cost is the third leg of the triangle. This is one of the most important parts, simply because this can determine what parts of the project can or cannot be undertaken. Without the proper funding for the project, little can likely be done.
Answer Link

Otras preguntas

Is energy in fossil fuels is derived from the energy stored in plants and animal matter?
how do you convert units within a measurement system
Which was expected from the citizens of the polis? A. earn citizenship B. follow the ruler's dictates without question C. serve on juries D. vote in presidentia
A bakery sold 111 cupcakes in one day. The head baker predicted he would sell 91 cupcakes that day. What was the percent error of the baker's prediction? 18.02%
Solve by substitution X+3y=1 and -3x-3y=-15
2/3 of what number is 16?
3x+y=5 , 2x-2y=22 solve the system of equations by the addition method
Which biome is characterized by low annual rainfall, less than 26 centimeters (about 10-11 inches) per year?
during a bike challenge, riders have to collect various colored ribbons. each 1/2 mile they collect a red ribbon, each 1/8 mile they collect a green ribbon, and
What is a gene? A. a section of a protein that codes for DNA B. the alternate version of a trait C. the visible trait in the F1 generation D. a section of D