szymon0325 szymon0325
  • 01-05-2014
  • Mathematics
contestada

how many year and months did it take to build blackpool tower england

Respuesta :

anishrpatel anishrpatel
  • 01-05-2014
The Blackpool Tower took 3 years to build using about 2,500 tons of steel and 5,000,000 bricks. The tower was officially opened to the public in 1894. The architects of the project, Messers Maxwell and Tuke, died before the building was completed.
Answer Link
shivani shivani
  • 01-05-2014
to build blackpool tower england it took about 3 years

hope that  helps!
Answer Link

Otras preguntas

3. Brandy is writing a research paper on ways to clean up oil spills in the ocean. Her thesis is that using a substance like hay or human hair would be most eff
At what temperature will 0.654 moles of neon gad occupy 12.30 liters at 1.95 atmosphere
what was the modern-day state of Utah called during the civil war
Which numbers are solutions to the inequality x < −4, using the replacement set {−10, −4.3, −4, −3.9, 2}? Choose all answers that are correct. A. −10 B. −4.3
what are two factors that influence the gravitational pull of an object?
Irish Potato Famine: Why did so many people starve to death during the Irish potato famine?
Should children be restricted from caffeine use?why? is this a matter for government involvement? parental guidance? Explain
15/40 in lowest term I need it so bad now
Do all the dimes or all the nickels have a greater total value
What was a typical day like for slaves