In a project network, the critical path is the sequence of activities which has the:________.

Respuesta :

66hello60
66hello60 66hello60
  • 03-08-2022

Answer:

The correct answer is the longest time

Answer Link

Otras preguntas

A chemical reaction in which two elements or radicals change places with two other elements or radicals is a _______ reaction. A. double replacement B. combin
Which word or words in the sentence does the participle modify? I am watching the marching band in the parade.
y - 5 = -2x - 4Write in simpilest form.
Which careers have the highest minimum experience requirement? Network administrator Software architect CIO System administrator
The majority of Portugal's colonies in Africa were located in Eastern Africa. a. True b. False
first free settlement of africans in America
The energy to power passive transport comes from:
write 4/9 5/9 ratio in simplest form
7 divided by blank equals 56
There are 60 tables in a restaurant, with 25% of them seating 2 people. The tables remaining seat 4 people. How many seats are there in the restaurant?