jhapriyanshu010
jhapriyanshu010 jhapriyanshu010
  • 15-02-2022
  • Mathematics
contestada

If 24 men complete a work in 10 days , then 12 men can complete the same work in​

Respuesta :

Salvatore5Mikaelson
Salvatore5Mikaelson Salvatore5Mikaelson
  • 15-02-2022
The answer would be 20 days all you have to do is multiply 10 by 2
Answer Link
jenishar58
jenishar58 jenishar58
  • 15-02-2022

Answer:

if 24 men can complete work in 10 days then 12 men ca complete work in 20 days just multiply by 2

Answer Link

Otras preguntas

What is the term used for a play that is performed exactly as it is written? adapted direct translation indirect translation
Normal faults occur from _____ stress and reverse faults occur from _____ stress.
Which sentence uses quotation marks correctly? A. Have you seen the wonderful Japanese animated movie called "My Neighbor Totoro"? B. My father enjoys reciting
Let f(x) = x2 - 81. Find f-1(x).
What is the correct possessive form of bridges? bridges bridges’ bridges’s bridge’s
Which of the following was NOT a remote cause of World War I? A. a growing sense of nationalism B. the decline of monarchies C. an increased policy of imperiali
Which outcome resulted from the period of Prohibition in the United States?
The famous character Don Quixote suffered from ____ that windmills were giants and his old horse was a young steed. A. collusions B. deluges C. delusions D. pot
Who is the intended audience of the Abraham Lincoln’s The Gettysburg Address?
Despite the grove owners’ hard work, the orange crop had _____ overnight. Which verb should be used with the helping verb had in the sentence? freezed frozed fr