It takes 6 workers 8 hours to tile a hall . How long will it take 4 workers to complete the same job

Respuesta :

icandoitjwk icandoitjwk
  • 15-01-2022
6w=8
2w=8/3

So
4w=8/3x2
4w=16/3
Answer Link

Otras preguntas

The socialist party in russia was split into which two groups? a. mensheviks and bolsheviks b. bolsheviks and anti-tsarists c. mensheviks and leninists d. l
Three of the common characteristics of hunter-gatherer communities are _____. Select all that apply. a. they stayed in one place for long periods of time b.
Yo saco la basura ___ por la semana: los jueves y los sabados. A nunca B dose veces C tres veces D una vez
doctor has ordered that a patient be given 20 g of glucose, which is available in a concentration of 70.00 g glucose/1000.0 mL of solution.What volume of solu
The monthly bank statement has to be compared with the: a. credit card statement b. checkbook c. deposits d. check register user: an alternative to paper ba
Zoey is designing a jewelry box in the shape of a rectangular prism. The base is 6 inches by 5 inches and the height is 4 inches. If Zoey wants to cover all fac
What makes ✔️7 irrational?
Fill in the blank with the correct direct object pronoun, based on the word in parentheses, that best complete this sentence: Nosotras _______ servimos. (sopa
Use the following DNA strand, GCGATTGAAT, to create an RNA strand. Could you please answer the question and explain how you did it?
how are physical and mental challenges connected to heroism?