ronieshabrown13
ronieshabrown13 ronieshabrown13
  • 02-12-2021
  • Mathematics
contestada

a contactor hired 150 men to pave a road in 30 days.how many mem will be hire to do the same work in 20 days​

Respuesta :

kevinmario2008 kevinmario2008
  • 05-12-2021

Answer:375

Step-by-step explanation:W = RTN

1 = 1/7500(20)N

1 = 20/7500N

1 = 2/750N

750(1 = 2/750N)

750 = 2N

750/2 = N

375 = N

There are 375 men to do the job in 20 days

Answer Link

Otras preguntas

Complete the following sentence. A qualified landscape architect will usually hold a college degree, may hold an advanced degree, and will often hold a _______
HELP PLEASE! 11 POINTS!
Directions: Read and analyze the following statements carefully. Write the word TRUE if the statement is correct andwrite the word FALSE if the statement is wro
Helppppppppppppppppp
There are 24 chairs in a room numbered 1 through 24. If nine girls and 15 boys sit on these chairs at random, what is the probability that the thirteenth chair
Is this logos or ethos?
Which of the following is the line of symmetry for the figure shown below? B. A. Line A O B. Line B C. Line C O D. This figure is not symmetrical.
What is the image of (2, 4) after a reflection over the x-axis?
paraphrase the following sentence: "To be an effective problem-solver, you need to be able to manage broad chunks of knowledge, and also be able to perform crit
Đốt cháy hoàn toàn 0,06 mol hỗn hợp X gồm hai amin no, đơn chức, mạch hở và một hiđrocacbon cần vừa đủ 0,18 mol O2, thu được hỗn hợp Y gồm H2O, 0,11 mol CO2 và