abelmulugeta19 abelmulugeta19
  • 11-10-2021
  • Computers and Technology
contestada

consider 4 jobs arriving in ready queue in the same order at time =0 if BT requirements of these jobs are 4,1,8,1 respectively what is completion time of p1 assuming round robin with TQ =1

Respuesta :

marietavukadinovic marietavukadinovic
  • 11-10-2021

Answer:tq we

Explanation:

t rhh

Answer Link

Otras preguntas

Match the numbers to their equivalent alternate form. 1. 60% 2. 0.1% 3. 1/80 4. 2/3 5. 4/25 6. 0.08 7. 0.35 8. 125% 9. 0.125 10. 110% a. 1/1000 b. 1/8 c. 3/5 d.
A streak test is used to identify minerals by looking at the color of the streak made by rubbing the mineral against rough, uncolored ceramic or porcelain. The
How many ways can 12AFM textbooks be arranged on a shelf?
Smitty's is a bait and tackle shop near Lake of the Ozarks, Missouri, owned by Red Smith. Smitty's has a website, www.smittys. Smitty's Bait Shop is located in
Helppppppppppppppppppp
What kind of table lists the quantity of a good that a person will buy at different prices?
The primary means for transmitting messages between the brain and the rest of the body is the ______.
"If a company uses a process costing system to account for the costs in its five production departments, how many work in process accounts will it use?"
Calculate the mass, in grams, of each sample. a. 1.1 * 1023 gold atoms b. 2.82 * 1022 helium atoms c. 1.8 * 1023 lead atoms d. 7.9 * 1021 uranium atoms
Opportunity cost is: * a. about half of the monetary cost of a product. b. the dollar payment for a product. c. the benefit derived from a product.