samirphokrel977
samirphokrel977 samirphokrel977
  • 15-08-2021
  • Mathematics
contestada

In how many days could 20 boys do a peice of work which 25 boys can do in 32 days ?​

In how many days could 20 boys do a peice of work which 25 boys can do in 32 days class=

Respuesta :

shresthashanta216
shresthashanta216 shresthashanta216
  • 15-08-2021

baiiiiwiedujjjdjdhsb20

Answer Link

Otras preguntas

What is the midpoint of the line segment with endpoints (-1,7) and (3,-3) A(2,2) B(1,2) C(2,4) D(1,4)
SOMEONE PLEASE JUST ANSWER THIS FOR BRAINLIEST!!’ Factor as the product of two binomials. 25 - x^2 = ___
For the next RSM Award ceremony, it was decided to decrease the length of the main poster by 12% and to increase its width by 15%. By how many percent did the p
Which statements describe the Richter scale? Check all that apply. A. It gauges fault movement during an earthquake. B. It measures large earthquakes far from t
I am thinking snow or spring. Please help asap
Amir stands on a balcony and throws a ball to his dog, who is at ground level. The ball's height (in meters above the ground), xxx seconds after Amir threw it,
Figure 1: exports from New England colonies
Which of the following should workers do to prevent being pinned between equipment or other objects? A. Avoid placing themselves between moving vehicles and an
Why was Rhode Island founded?
which of the following is not a chemical property? a: reactivity with oxygen b: malleability c: flammability d: reactivity with acid