15men can complete a piece of work in25days. how many men should be added to complete the same work in15days.​

Respuesta :

mhanifa
mhanifa mhanifa
  • 04-08-2021

Answer:

  • 10 men

Step-by-step explanation:

Amount of work done by 15 men is:

  • 15 men *25 day = 15*25 man*days

Same work can be done by 25 men, in 15 days, so 10 more men should be added.

Answer Link
abovejosh
abovejosh abovejosh
  • 04-08-2021
Answer: 10 men explanation: guy above me
Answer Link

Otras preguntas

solve the inequality 1/2b+2≤8
Which of the following can be the third side of a triangle whose other two sides measure 8 inches and 10 inches A) 17inches B) 18inches C) 19 inches D) 20 inche
Although republican Richard Nixon ultimately won the presidency it was the democratic national convention that characterized the election of 1968 what happened
To kill a mocking bird chapters 7-11 1. what is scouts grade? 2. what is unusual about Jem's breeches when he went back to get them? 3. what do the children fin
Calculate the diameter of the circle.
HELP IN THE MIDDLE OF EXAM 100 POINTS Which details from the excerpt provide more information about Shelley’s idea that poetry "makes immortal all that is best
Everyone went on the field trip except Jackie and ______.A.MeB. IC. SheD.Myself
please help meh I give brainliest ​
Find the zeroes of the polynomial 100x^2 - 81
Hunter misses 10% of the free throws he attempts in a season. How many total free throws did he attempt if he missed 54?