PLEEASE ANWER QUICK: The project manager is writing the requirements document. Which phase of the project life cycle is he in?
project closure
project planning
project initiation
project execution ​

Respuesta :

Animmango
Animmango Animmango
  • 01-05-2021

Answer:

I think, project execution. He is writing the requirements document. which mean it doesn't project closure and initiation. then he did it which mean it doesn't project planning.

Answer Link

Otras preguntas

What is jazz like today? 1 paragraph.
When a person spins a bucket of water in a circle, the force acting on the bucket to keep the water inside is called
Which ideas did conservatives of the 1980s support? Select three options. lower income taxes reduced drug penalties fewer government programs stronger national
· sound · parallel · mechanical · not a vacuum · needs a medium · compressions and rarefaction What type of wave is being described? A) compaction B) electro
A person is in a room whose walls are maintained at a temperature of 17 °C. The temperature of the person’s skin is 32 °C. The surface area of the person’s skin
What is the difference between a strong acid and a weak acid? There is no difference between a strong acid and a weak acid because they are both acids. A strong
What is ultraviolet radiation
Solve for x. Round your answer to the nearest thousandth. a. 7.08 c. 8.442 b. 23.869 d. 10.903 Please select the best answer from the choices provided A B C
Find the product. (n 3)2 · (n 5)4
How many countries are there