maaf34nb8f maaf34nb8f
  • 01-04-2021
  • Engineering
contestada

A short framing member that fills the space
between the rough sill and the soleplate is a

Respuesta :

iBear25k
iBear25k iBear25k
  • 01-04-2021

A short framing member that fills the space between the rough sill and the soleplate is a cripple stud.

(HAVE A GOOD DAY!!!)

Answer Link

Otras preguntas

A carpenter makes chairs with slats that run across the chair as shown. each chair uses 7 slats. he needs to make 24 chairs.how many slats must he make?
Four of 12 people choose milk what fractional part of the group chose other drinks
What is the is point-slope (3,1) m=0?
Which word correctly completes this sentence? Band practice was so _____ that by the time it ended, we all knew our parts by heart. A. productive B. numerous
A common disease of the skin is: leukemia acne anemia diabetes
how did The roman republic influenced the constitution of the united states
Which of the following statements about communication is most accurate? A. Attitudes change day by day, while moods persist over time. B. Expressing your
What is the change in elevation from 134 feet below sea level to 29 feet above sea level?
Who ran for president in 1824? (Name all)
ASAP.. please help it's important!!