victoriavega801
victoriavega801 victoriavega801
  • 02-03-2021
  • Mathematics
contestada

Theodore hired a roofer for some work. on final bill he was charged a total of 642$ .425$ was listed for parts and rest for labor . if the hourly rate was 31$ how many hours of labor was needed ? ​

Respuesta :

Jackel60
Jackel60 Jackel60
  • 02-03-2021

Answer:

7 hours

So you so 642-425= 217, then you do 217/31= 7

your answer is 7

Answer Link

Otras preguntas

How many outcomes are there if you roll two dice with side sides
How many outcomes are there if you roll two dice with side sides
What is the additive inverse of 4x
At the veterinarian's office, 4 animals out of every 5 seen were cats. A total of 35 animals were seen.a. How many cats were seen?b. The ratio of male cats seen
What is (2x-3) squared?
Use a factor tree to find the prime factorization of 164
Gabriella wants to tile a room with an area of 320 square feet. The width of the room is 4/5 its length. What are the length and width of the room?
I need an example of Alliteration in A Tale of Two Cities asap please
Gabriella wants to tile a room with an area of 320 square feet. The width of the room is 4/5 its length. What are the length and width of the room?
if x is the principle square root of 7, what must be true.