michelovessoccer michelovessoccer
  • 02-01-2021
  • Computers and Technology
contestada

When using a software budget, you should feel very confident if you choose a solution that looks like it will come in exactly on budget, without any overage costs.

a
True

b
False

Respuesta :

PrestonHedlund
PrestonHedlund PrestonHedlund
  • 02-01-2021

Answer:

probably false

Explanation:

because u dont want a budget to b exact u want it completely covered

Answer Link

Otras preguntas

belinda has a bag of beads. She uses 1/3 of the meads to make a bracelet and 3/5 of the beads to make a necklace. she uses 36 more beads to make the necklace. H
2. Which organelles are involved in energy conversion? (1 point) A.)mitochondria and chloroplasts B.)mitochondria and ribosomes C.)smooth and rough endoplasmic
A scientist is studying the population decline of cheetahs in Africa and the Middle East over the past several decades. Which best describes this situation? a c
All hypothesis contain three things
robin tosses a fair coin and then draws a ball from a bag that contains one red, one blue, and one green ball. what are the possible outcomes for the experiment
A box of powdered laundry detergent contains 5.2 ounces of detergent. It takes 0.7 ounce of detergent to clean a load of laundry. How many full loads can by cle
How did the United States persuade Japanese leaders to sign a trade treaty ?
List multiples to find the LCM of 27 and 45 A. 45 B. 675 C. 1, 215 D. 135
What did the roman wear on their toga or tunic
which of the following represents a polygon that is two times the size of the original polygon? A: (x' , y') = (0.2x,0.2y) B: (x' , y') = (1/2x, 1/2y) <-- F