When looking at a program board at the end of program increment (PI) planning, what does it mean when a feature is placed in a team's swim lane with no strings

Respuesta :

IfeanyiEze8899 IfeanyiEze8899
  • 04-01-2021

Answer:

It simply means that other teams can independently complete the feature.

Explanation:

PI or program increment is a planning interval during which an agile release train (ART) plans and produces working and tested software and systems. It takes a duration of 8 to 12 weeks

Agile teams can access and independently complete various ARTs found in their swim lanes with no strings.

Answer Link

Otras preguntas

I need a good topic sentence for my essay about life experiences. I wanted to talk about trust on people or a recent break up but I have no idea what to start w
Who revolted in the French Revolution and why?
write each expression as the product of two factors   1x3+7x3=
What is the factored form of 5x+x^2=0
How do fungi make people sick?
What important idea from Thomas Malthus inspired Darwin?
why was renaissance a turning point in world history
Every 6 seconds a pendulum completes 1 cycle. What are the period and frequency of this pendulum?
how did African Americans challenge segregation after World War 2
Nightjars possess a camouflage perhaps unparalleled in the bird world: by day they roost hidden in shady woods, so ------- with their surroundings that they a