Michaelyork7608 Michaelyork7608
  • 15-01-2020
  • Social Studies
contestada

The primary survey line running east and west in the rectangular survey system is a:

Respuesta :

fichoh
fichoh fichoh
  • 15-01-2020

Answer: Baseline

Explanation: The Baseline refers to the primary line that running east west in a rectangular survey. The Baseline together with the principal meridian which runs north-south are control survey lines. The Baseline, Principal Meridian and standard parallel which is established parallel to the Baseline form a framework for further surveying.

Answer Link

Otras preguntas

Mary bought a bag of rice for 9,000.00 and sold it for 6,300.00. What was her percentage loss?​
someone help, this is trig, i have to do SOHCAHTOA here, i think this question is for sin but im not sure how to do it
What is the intersection point for this system of equations? x + y = 49 .05 + .25y = 8.65
what is the y intercept of the lline 2x-3y=-12
Which of the following trigonometric inequalities has no solution over the interval 0 ≤ x ≤ 2π radians? 1) cos(x) < 1 2) cos(x/2) < 1 3) csc(x) < 1 4)
What is the slope of (-8,1) (6,8)
all of the following are problems for marine organisms Except: turbulence, colder water, less sunlight, weaker currents
What is the equivalent ratio to 12:6? 1) 20:10 2) 9:2 3) 35:18
Interior and exterior angles Find x.
The destruction of which structure signaled the end of the Cold War? 1) Berlin Wall 2) The Statue of Stalin 3) Military bases in Germany 4) None of the above