The method of dividing the project scope into many parts that, when combined, would constitute the project deliverable is called _____:

Respuesta :

gomezgerman032 gomezgerman032
  • 04-01-2020

Answer:

decomposition

Explanation:

This is a technique used to divide and subdivide the scope of the project and the future to deliver, in smaller and more manageable parts. It is defined what work is going to be done and which is not. It is a hierarchical decomposition oriented to the deliverable product of work and achieve the objectives of the project.

Answer Link

Otras preguntas

What information is required
Add. Your answer should be an expanded polynomial in standard form. (-4° - 5y + 16) + (4y2 – y +9) =
what would be the dna base triplet of uug​
Find the value of x
An employee who is assigned to clean the frozen dessert dispenser at the end of the night must use CIP system. CIP is an acronym for
Help! What would d be?
TUDIvIl P.. lesson 34) The piggybank had $25.65 in dimes and quarters. If there were 20 more quarters than dimes, how many dimes were in the piggybank?
The snack machine at the mall is broken. It will not take any quarters. It only takes dimes and nickels. A snack costs 45 cents. If Antonio has 15 cents in nick
In Triangle PQR, the measure of ZR=90°, the measure of ZP=51°, and QR = 38 feet. Find the length of PQ to the nearest tenth of a foot.
How do I make a table from slope-intercept equation 4x+2y=4 showing X and Y