Instability of user capability needs, design, and production processes are most likley to cause:_________-

Respuesta :

ranijoshijj97 ranijoshijj97
  • 09-01-2020

Answer:

Cost increase and Schedule Slips

Explanation:

Schedule slips is the act of missing the deadline of the project and in order to avoid the schedule slips, person should plan their projects carefully so that could avoid the delays the schedule.

Instability, states it lacks the stability in the capability design, production processes and needs of the project, so, if the users lacks in the following areas, which in turn result in the increase in the cost of the project as well as the schedule slips.

Answer Link

Otras preguntas

greyhounds can reach speeds of 20.1 meters per second. which conversion factor can be used to find this speed in meters per minute
You have to make a factor tree
Please show your work - Thanks!
In what british industry did the industrial revolution first take hold?
Why might we expect venus and earth to be similar?
How many calcium ions are there in caco3?
how did religions impact Justinian culture and daily life please help fast
What is the maximum number of electrons that the d-orbitals can hold?
An economist who studies the sales and profits of a large corporation would be classified as a(n) macroeconomist. stock broker. social economist. microeconomist
The stopping distance, d ( in feet) for a truck moving at a velocity (speed) v miles per hour is modeled by the equation: d=0.04v^2+1.1v What is the speed of th