Sadeghshakeri97 Sadeghshakeri97
  • 02-12-2019
  • Mathematics
contestada

60% of the work is done in 17 minutes, 40% of the same work, when is done (in minutes)?

Respuesta :

bridgecostello bridgecostello
  • 02-12-2019

Answer:

It would be 11.333 minutes

Step-by-step explanation:

I solved this by setting up a cross multiplication.

60%/17 so then 40/x.

Then here cross multiplying. 60x=680. divide by 60 and x would = 11.33

Answer Link

Otras preguntas

What are two key characteristics of a good scientific investigation
A waterfall in a park is located 6 miles east and 3 miles north of the visitors center. There is a picnic site 1 mile east and 2 miles north of the visitors cen
Which type of equilibrium exists in a sealed flask containing Br2(ā„“) and Br2(g) at 298 K and 1.0 atm?(1) static phase equilibrium (2) static solution equilibriu
What are two key characteristics of a good scientific investigation
Solve for the indicated variable 4c=d for c
A lack of Hungarian representatives in the government and ____________________ lead to uprisings against Austrian rule.
increasing your vocabulary mean? A. youll spend less time on revision B. youll write more lively sentences C. youll write longer sentences D. youll be able to s
7eāˆ’4=31 solve for e.
In Bear Creek Bay in July, high tide is at 1:00 pm. The water level at high tide is 7 feet at high tide and 1 foot at low tide. Assuming the next high tide is e
Which statements describing how Renaissance ideas spread beyond Italy are true?Choose all answers that are correct. A. Pilgrims on their way to the Holy Land of