​Finishing the construction of a home two days after the contract called for completion (no injury occurs) most likely will be considered

Respuesta :

andriansp andriansp
  • 08-06-2016
Finishing the construction for a longer period than the date that already agreed upon would be most likely considered : Breach of Contracts.
Which mean that the constructor basically fail to met his end of the contract agreement, causing the other party has the right to walk out from their contract
Answer Link

Otras preguntas

How did the entertainment industry help people cope with the great depression?
Explain why machines are never 100% efficient.
HELP PLEASE !!!!!!!!!!!!!!!!!!!!!!
The difference between two positive integer is 4 and the difference between their reciprocal is 1/24. Find both integers by using quadratic equation
When Rome started, it was mostly just a... 1. Vast country 2. Large Empire 3. City-state 4. Territory, ruled by another country
6. what was the result of the allies intervention in Russia's civil war?A. A democratic provisional government was installed. B. The war came to a rapid conclus
The perimeter of a basketball court is 9090 meters and the length is 6 meters longer than twice the width. what are the length and​ width?
Which best explains the relationship between parent rock and soil composition?
How does the flight of Duncan's sons play into macbeths hands
what's the side length of a square that has an area of 169 square meters