How deep is the service duct bank measured from finish grade to the top of the concrete encasement that runs between the D.L. pad mount transformer and the main electrical switchboard

Respuesta :

RayCrochet RayCrochet
  • 03-10-2019

Answer:2' 6

Explanation:

E1.1

2 feer deep 6 inch divider

Answer Link

Otras preguntas

How many compounds are in a wooden block
determine the graph that has the following properties: domain: (- infinity, 4) , [4, infinity) range: [0, infinity) axis of symmetry: x=4
Lisa drinks 3 1/2 pints of milk a day. How much is this in cups?
Which type of unemployment is most closely connected with the saying "you can't teach an old dog new tricks"? a. frictional. b. voluntary. c. seasonal. d. cycli
A rectangular pool is 18 meters wide and 24 meters long. If you swim diagonally across the pool, how many meters would you be swimming?
Solve log2x = log53 + 1 by graphing. Round to the nearest tenth.
Light is not a wave because it does not need a medium. true or false.
Why is the 13th amendment of great importance
Let f(x)=2x^2+7x-5 and g(x)=-8x^2-3x+5 what is g(x)+f(x)
How many grams are in 0.0150 moles of caffeine c8h10n4o2?