_______ planning develops alternative courses of action that may be used in a specific situation when things do not go according to plan.

Respuesta :

lory37
lory37 lory37
  • 15-11-2018
Pre- is probably the answer, I’m sorry if it’s wrong.
Answer Link

Otras preguntas

The Glorious Revolution was a
Identify and summarize five major laws that deal with equal employment opportunity.
Which structure would be expected to be constructed by endoplasmic reticulum?
Having a stronger negative or positive change on one side is called what ?
An earthquake registered 7.4 on the Richter scale. If the reference intensity of this quake was 2.0 × 1011, what was its intensity?
What's the next three terms of the following sequence 160,136,112,88
Sale price is $75 it was 20% off what was the original price
Approximate the square root of 18 to the nearest tenth and plot the number on a number line SHOW ALL WORK
Twice a number, x, increase by 4 is less than 2 or greater than 8. What is the compound inequality that represents the situation?(Comment below if you need answ
Which of the pairs of molecular structures shown below depict enantiomers (enantiomeric forms) of the same molecule?