a contractor estimates that he can paint a house in 5 days using 6 men. if he actually uses 5 men for the job, how many days will they take to paint the house?

Respuesta :

Einstein08 Einstein08
  • 01-09-2018
it will take 4 days to paint the house with 5 men
Answer Link
tramserran
tramserran tramserran
  • 01-09-2018

1 house = 6 men x 5 days  = 30 man days

Need 30 man days with only 5 men: 30x = 5 men   →  x = 6

It will take 6 days for 5 men to complete the job.

Answer: 6 days


Answer Link

Otras preguntas

Why is physics the most basic science?
President Hoover responded cautiously to the Great Depression because he A. thought that the business cycle would correct itself. B. was distracted by the gian
Non-intersecting lines that are separated by equal distances at every point can best be described as _____. a. parallel b. perpendicular c. skew d. adjacent
what is the slope of y=1/4x+1
620 + 107 round estimate the sum
what is correct sum of 1/10 and 8/100
Which equation represents the word sentence? The product of 6 and a number increased by 4 is 28. a. 6x + 4 + 28 b. 6x + 4 = 28 c. 6x – 4 = 28 d. 6x + 28 = 4
how to write 6.7 different ways
Which important civil right is not granted to people living in U.S. territories? a. full Congressional representation b. electing local officials c. trial by
Leticia wants to go on a band trip to new York for spring break. It cost $1200 per student.The band will pay 15% of the cost for each student