The critical path is the sequence of activities that takes the longest time.
a. True
b. False

Respuesta :

lancedepriest30 lancedepriest30
  • 14-05-2018
The statement is true
Answer Link

Otras preguntas

how is aluminium foil able to reduce heat loss through the walls of a house
What are 5 pros and cons of living in sparta and athens in greece?
4/3v^2x -5/6vx^3 what is this answer for algebra
why did president Truman believe that the United States should sign the North Atlantic treaty
why do people join interest groups?
two trains leave stations 408 miles apart at the same time and travel toward eachother. one train travels at 95 miles per hour while the other travels at 75 mil
what is the difference between concealed and revealed propaganda
solve the equation for C f=9/5c+32
1. What is the value of the expression below? Please show work 3⁴+9= A.21 B.39 C.43 D.90 2. Which expression is equivalent to 5(d+1)? Please show work A.5d+5 B.
why do people join interest groups?