Hearts2272 Hearts2272
  • 12-04-2024
  • Engineering
contestada

A tower crane has a hoist motor rated at 163 hp. If the crane is limited to using 67.0% of its maximum hoisting power for safety reasons, what is the shortest time in which the crane can lift a 5750 kg load over a distance of 79.0 m? Assume the load is lifted at a constant velocity.

Respuesta :

Otras preguntas

Read what this says and figure out what is missing: person is to house as soldier is to _______ Also find out what this riddle means April showers bring may
What two factors affected the development of new species
PLZ PLZ ✨✨✨✨ HELP WILL GIVE BRAINLIEST
Aversive conditioning is the process by which a conditioned response can recur after a time delay. the process of rewarding successive approximations of desired
La altura h sobre el nivel del suelo (en pies) de un cohete de juguete, t segundos después de ser lanzado, está dada por h = -16t2 + 120t. ¿Cuándo estará el coh
How do you do this 4(4-4v)=48
Help Please Thank You In Advance​
Identify the equation of the translated graph in general form x^2-y^2=8 for T(4,3)
Last month, 17 people showed up to help a local charity. This month, 55 people volunteered. What is the percentage increase?
what changes in television and news coverage were important in the 1990s?