Arnott6656 Arnott6656
  • 16-01-2024
  • Mathematics
contestada

A construction crew built 10 km of road in 40 days. Give 2 different unit rates using this relationship.
a) 0.25 km/day, 4 days/km
b) 0.4 km/day, 25 days/km
c) 0.5 km/day, 20 days/km
d) 0.3 km/day, 30 days/km

Respuesta :

Otras preguntas

Writers can use a technique called foreshadowing. what is foreshadowing? a. an implied theme for the story. b. clues to hint at what will happen next. c. the
If h(X) = 2 —— 3+X Find: h(X-3)
Freedom, equality, the rights - these ideas are products of the
Una de las cosas que nos gustaba más era _____ a la cuerda. A. saltábamos B. saltaría C. saltamos D. saltar
A private airplane leaves an airport and flies due east at 192 km/hr. Two hours later, a jet leaves the same airport and flies due east at 960 km/hr. How long a
All vehicles must have two red visible lights from a distance of what
Segments UV and WZ are parallel with line ST intersecting both at points Q and R respectively According to the given information, segment UV is parallel to segm
What is the difference between a lease and a loan?
equalent weight of oxalic acid
What is the key building block of living tissue and ecosystems?